What You Need

Step One

Prepare Your Surface
Fusion Stone is installed over a Plywood or OSB substrate. Ensure that the substrate has been covered in a code approved, breathable, weather resistant barrier. Not required on interior installations.

Step Two

Installing the Starter Strip
Starter Strips are used at the base of all jobs as well as above any openings (windows and doors). Level and install the Starter Strips using the stainless steel screws provided.

Step Three

Installing Fusion Corners
Begin installing Fusion Stone at the corner. As you build the corner ensure that you alternate short and long sides.

Step Four

Complete Installing Stone
Continue to lay the sone in the pattern described in the detailed instructions. The last stone installed on every row may need to be cut to length.